Translate Customer Needs into Engineering Requirements

Use when an FDE or solution consultant owns the conversion of observed customer needs into a clear, testable engineering specification for product or implementation teams. The output is an implementation-ready problem and requirement definition, not a commitment that engineering has accepted a roadmap date. Do not use when the request is only a bug reproduction or an already-approved change ticket.

Don't just read it. Run it.

Start the work here, keep the important context together, and hand it off to people or AI.

Use playbook

Starting inputs

customer *

Customer or engagement identifier.

string

sourceMaterial

Customer interviews, recordings, support cases, examples, and relevant specs.

array

knownConstraints

Platform, integration, security, contractual and delivery constraints.

array

requestOrProblem *

User request, observed pain, or desired workflow.

string

Steps

  1. 1

    Find the underlying job and verify demand

    Reconstruct the triggering workflow, actors, frequency, current alternative, breakdowns and measurable consequences from customer evidence. Distinguish directly observed user need from a proposed feature solution. Capture examples, counterexamples, stakeholder disagreements and the number of distinct customers affected when visible. Validate where the request fits the intended product or deployment strategy. Gate: the team can articulate the user problem and business reason independently of any proposed implementation.

    V2 practical protocol:
    Problem evidence template: customer role, job-to-be-done, trigger, actual example, frequency, impact, current workaround, requested feature, strength of evidence and contrary examples. Assign provisional requirement identifiers only after the user outcome is clear, e.g. R-001; do not treat every raw request as a requirement. Trace observed problems to user impact and intended measurable outcomes, keeping customer-specific exceptions visible. If no user example exists, design a targeted validation question before committing to product scope.

  2. 2

    Bound scope and compare solution directions

    Draft functional outcomes, in-scope workflows, non-goals, quality attributes, integration boundaries, data constraints, exceptions, and dependencies. Explore at least one simpler workaround and one full solution; note trade-offs and reusable versus customer-specific work. Seek engineering/product input on critical feasibility or architecture claims rather than assuming them. Distinguish contractual commitments from wishes. Gate: solution direction can be chosen with risk and scope clearly visible.

    V2 practical protocol:
    Requirement boundaries: for each proposed solution compare status quo, workflow workaround, minimal reusable product change and customer-specific customization. Record goals/non-goals, supported and unsupported actors, data ownership, integration surfaces, failure and recovery behavior, latency/load/security needs, contract restrictions and dependency assumptions. Flag whether requests change product strategy or security model and require product/engineering approval. Reserve IDs for requirements only when sufficiently testable; avoid writing architecture as if it were customer-approved fact.

  3. 3

    Write a testable PRD or technical specification

    Use write-spec if accessible for structure and acceptance-criteria discipline; otherwise create a self-contained PRD. Include problem, users/personas, goals, scope/non-goals, user journeys, requirements prioritized by criticality, exception cases, permission/security behavior, integrations, measurable success metrics and explicit assumptions. Each requirement must be independently testable; avoid vague words such as fast, easy or secure without acceptance criteria. Gate: an engineer and QA reviewer can infer the required behavior without reverse-engineering a sales conversation.

    V2 practical protocol:
    Traceability table: Requirement ID | user problem evidence | priority (Must/Should/Could) | behavior and boundary | acceptance scenario ID | system/data dependency | non-goal/exception | status/open question. For each acceptance criterion use Given [context], When [event], Then [observable outcome], with explicit failure/permission behavior and measurable units where relevant. Separate functional behavior from nonfunctional constraints and operational requirements. Refer to the optional write-spec skill for structure if accessible but preserve this minimum in the playbook itself. Each Must requirement needs at least one positive and one material negative/error test, or an explicit explanation why not applicable.

    Skills anthropics/knowledge-work-plugins product-management/skills/write-spec github
  4. 4

    Review feasibility, edge cases and acceptance

    Review the draft with engineering, product, security/data owner and customer-facing owner where relevant. Challenge missing edge cases, error and recovery behavior, scale assumptions, integration ownership, dependencies and build-versus-buy. Record conflicts, decisions and open issues in the document without silently choosing for the team. Define what customer acceptance can observe versus what only engineering tests can validate. Gate: material ambiguities are resolved or labeled as blockers before implementation is promised.

    V2 practical protocol:
    Review protocol: walk one happy path, one permission failure, one bad input/empty result, one integration error/retry and one scaling/latency constraint relevant to the use case. Verify that every Must has an acceptance test and every high-risk acceptance test maps to a requirement; identify dangling needs, untestable adjectives and implied product promises. Engineers review feasibility, QA reviews testability, product reviews priority, security/privacy reviews access/data impact, and customer-facing owner reviews user outcome. Record disagreement and authority rather than guessing consensus.

  5. 5

    Make the specification ready for engineering commitment

    Present a concise change summary, recommended scope, remaining assumptions, test cases, priorities, dependencies and measurable acceptance. Separate a ready-to-estimate specification from an approved development commitment. Obtain acknowledgement of feasibility or identify exact missing decisions; do not imply sprint, budget or delivery-date approval. The final result is the quality of the spec itself, without adding an unrelated generic handoff ceremony. Gate: the receiving team can estimate and plan from the artifact and knows which issues remain unresolved.

    V2 practical protocol:
    Ready-to-estimate gate: requirement IDs unique, top problem traceable to evidence, non-goals explicit, external dependencies and data contracts stated, Must-level acceptance criteria independently verifiable, severity of unresolved risks identified, and actual review status documented. Produce two short views if needed: engineering estimation detail and a customer-facing outcome summary that does not reveal internal implementation assumptions. Make clear that an estimate-ready PRD is not a delivery-date, budget or roadmap commitment.